Back to top

Falco Completes UK's Largest CyclePoint!

Home Case Studies Falco Completes UK's Largest CyclePoint!

July saw the opening of the UK’s largest CyclePoint cycle parking hub, with almost 1,000 spaces of mixed use cycle parking. The UK’s hottest day so far saw the The Rt. Hon. Simon Burns MP, Minister of State for Transport and Member of Parliament for Chelmsford officially open Abellio’s (train operator of Greater Anglia) new £680k CyclePoint at Chelmsford station.

GA staff at the network’s second busiest station were delighted as the Cyclepoint was full from day one and following on from the success at Leeds Cyclepoint, Falco’s relationship with Abellio continues to grow with Ruud Haket, Managing Director for Greater Anglia, thanking Falco in his opening speech for their excellent work. Following detailed discussion and planning meetings the facility was designed by Falco in conjunction with the team at Spence and comprises a mix of 991 spaces including;

Use

Spaces
Indoor secure 311
External maglok protected secure compound 144
External covered cycle parking 376
External uncovered cycle parking 160


The cycle parking products were all drawn from Falco’s range of robust cycle racks including:

FalcoLevel two tier cycle racks 686
FalcoVert semi vertical space saving cycle racks  145
FalcoToaster cycle racks  160
FalcoRail cycle canopy 105 metres of shelter


The facility benefits from Falco’s modular product range of shelter and cycle parking products enabling GA to ‘mix and match’ the products to meet the different requirements of cyclists. The FalcoLevel two tier rack is the UK’s most popular high capacity space saving cycle rack, whilst the FalcoRail canopy provides both single and double sided shelter with the option to extend in the future to meet growing requirements.

Ideally located on a new site, between the station and the station car park, Chelmsford CyclePoint represents a significant investment of £680k by Greater Anglia, with support from the Department for Transport (DfT), Essex County Council and Network Rail. The cycle hub combines secure cycle parking with increased capacity for cycles, supported by retail, cycle-hire and maintenance facilities in a single location for all cycle-related activity and cycle parking at a station.

The total cycle parking capacity at Chelmsford station has increased by over 40% with parking for almost 1,000 cycles in the new facility and both the Council and GA are looking to increase capacity immediately

Pictured with Falco Managing Director Jeremy Green, are the Minister Simon Burns, Abellio Managing Director Ruud Haket, Greater Anglia Project Manager Jo O’Donnell and Spence Managing Director Luke Spence.

Falco has been designing, manufacturing, supplying and installing cycle parking systems, canopies, shelters, secure stores and street furniture for over 60 years and has built up one of the largest product ranges in the UK. Falco provide free site surveys, free CAD design using Dynamic CAD blocks and a comprehensive supply and installation service.

For more information about the new CyclePoint at Chelmsford or about any of Falco’s product ranges please contact our helpful sales team on 01538 380080.

Customer Service & Technical Support

Our customer services team are on hand to offer product guidance and technical support. 

(01538) 380080 sales@falco.co.uk Subscribe to our Monthly eNews Newsletter

Subscribe to our Monthly ‘e-News’ Newsletter: Stay up to date with new product releases, company news and special offers by subscribing to our monthly ‘e-News’ newsletter.